Banner
Home > news > Content
Matters needing attention for installation of frosted glass installation partition
- 2019-05-15-

Teach you some precautions for frosted glass installation! Now when you mention the partition door, everyone will first think of the office glass partition, not only because it looks beautiful, but also because it is very practical, you can add a sense of visual amplification of the space, And it is still a choice with relatively high cost performance. So, what should you pay attention to when installing the office glass partition? Today, let ’s talk about the office glass partition!

1. The first thing to know is that the office glass partitions should be made of 12 mm tempered glass when they are highly renovated. They should be carved or polished under the parallel vision of people. The office glass partitions are generally at { {1}}. {{{2}} meters or 2 meters. Because the house of Shimizu Maopei is generally about 2. 7 meters, after removing the suspended ceiling, the general height is about 2. 4 meters, because it is too high, the lighting is not enough Good, so the distance should be moderate, not more than 2 meters. The commonly used thickness can be 1 0 mm, and the appearance is decorated with custom art patterns. It is fixed on the floor and wall with spacer hardware accessories. The main components are: glass door leaf, neutral plate, side plate, tie rod, foot Sleeve / foot, door lock, hinge, etc .; sequence from production to installation: ordering, cutting, opening, carving, packaging, shipping, installation.

2. Attention should be paid to the glass partition door of the installation office: 1, the combination of glass and stainless steel frame of the base frame should not be too tight. After the glass is placed in the stainless steel frame, the upper and side of the stainless steel frame should have {{ 1}} A gap of about mm, which is prepared for the thermal expansion and contraction of glass. 2 Before installing the office glass partitions, check whether the corners of the glass are square, whether the dimensions of the stainless steel frame are correct, and whether there is any shape deviation. In the corrected stainless steel frame, fix the azimuth line of the glass device and fix the line of the glass plate. 3. When installing the office glass partition, use a glass suction cup machine to suck the thick glass tightly, and then hold the suction cup to lift the thick glass plate by 2-3 and move it to Device orientation. Then insert the upper part of the glass into the limit groove at the top of the door frame, put the lower part of the glass on the bottom bracket, the lower part of the glass is aligned with the center line, the metal trims on both sides just seal the door frame to face the gap, and it is required to see both inside and outside No finishes took the mouth. {{5}} When the office glass is filled with sealant, it should be on both sides of the top limit groove and the bottom bottom bracket groove, and the gap between the thick glass and the frame column. At the location, when pouring the glass glue to seal the glue, start from the end of the gap that needs to be glued, and evenly pour along the gap, so that the glass glue forms a uniform straight line at the gap, scrape the remaining glass glue with a plastic sheet, and use a cloth Wipe away the glue. 5, butt joint between glass, when the fixed part of the glass door needs to be spliced ​​because of too large scale, the butt joint must have a width of 2-3 mm, and the edge of the glass plate Perform chamfering. After the glass is fixed, the glass glue is injected into the butt joint. After filling, use a plastic sheet to smooth the glue on both sides of the butt joint of the glass plate, so that the gap forms a clean and even straight line, and wipe the glue trace with a clean cloth on the glass surface.


TEL:18626885381    FAX:18626885058    EMAIL:XJ416@xjljkj.com

Mobile